{"id":7568,"date":"2022-09-02T08:00:31","date_gmt":"2022-09-02T06:00:31","guid":{"rendered":"https:\/\/in4mobackupstg.wpenginepowered.com\/support\/?post_type=resources&#038;p=560"},"modified":"2026-07-31T15:43:54","modified_gmt":"2026-07-31T12:43:54","slug":"project-manager-user-guide","status":"publish","type":"resources","link":"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/","title":{"rendered":"Project Manager"},"content":{"rendered":"<h2>The Project Manager Role<\/h2>\n<p>When a company has been assigned a project management task in a case, the task can be seen in the task list in the specific case.<\/p>\n<p>Depending on the insurance company configuration, some steps might already have been done by the insurance company, who is handling the case.<\/p>\n<p><strong>NOTE! A company can be assigned Project management tasks only, when the task has been selected as one of the provided services in the office information, via the page Company admin &gt; Offices.<\/strong><\/p>\n<p>Assigning the Project management task can be done, by clicking the<br \/>\n<strong>Edit<\/strong> link above\u00a0the map in the task. Assigning a project manager can also be done, by clicking the <strong>Assign members<\/strong> button under the tasks to the left.<\/p>\n<p><img decoding=\"async\" style=\"letter-spacing: 0em;\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607810-129-aef2d3fc.png\" \/><\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607811-130-caca3069.png\" \/><\/p>\n<p><strong>The project manager needs to look over the case for to<\/strong> <strong>determine needed actions<\/strong>. Main tasks are to set the schedule for the entire case, check that the work is done properly and on time, and report the progress of the case if needed.<\/p>\n<p>If a positive compensation decision is made and after the project manager is chosen &#8211; the task switches the status automatically to status<img loading=\"lazy\" decoding=\"async\" class=\"\" style=\"letter-spacing: 0em;\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607811-132-c689e7fb.png\" width=\"21\" height=\"21\" \/>.<\/p>\n<p>If the main inspection is not in status <strong>A<\/strong>, the project manager can still assign and set schedules for tasks.<\/p>\n<p>Task(s) can be added\/removed in a case by clicking on <strong>Add\/remove case tasks<\/strong> under the task list. Two case tasks can be added of the same type in one case if needed. In this case, it is needed to click on <strong>Extra tasks <\/strong>and to choose an extra task from the list that appears below. Last step is to click <strong>Save<\/strong> after all the selections has been made and they need to be confirmed.<\/p>\n<p><img decoding=\"async\" style=\"letter-spacing: 0em;\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607811-131-b090708d.png\" \/><\/p>\n<h2>Assigning Tasks to Companies<\/h2>\n<p>Once all the tasks have been added, it might be possible to assign the tasks to own company or to another partner of the insurance company, that is if the insurance company has given the rights for this.<\/p>\n<p>By clicking the <strong>Assign partner<\/strong> button and checking the task(s), it is possible to assign the task(s) to the same company. The last step is to select the partner from the <strong>Recommended office list <\/strong>to the right and click <strong>Save<\/strong>.<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607812-133-5b0f649a.png\" \/><\/p>\n<p>Alternatively, the task(s) can be assigned also to a partner in the task by clicking <strong>Choose<\/strong>.<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607813-134-6eb7c420.png\" \/><\/p>\n<h2>Assigning Tasks to Responsible Employees<\/h2>\n<p>Task(s) can only be assigned to employees of your company.<\/p>\n<p>In the task list, a task needs to be selected first to which a responsible person needs to be assigned for. When the task has been selected, the next step is to click <strong>Edit<\/strong> on the right next to <strong>Assignee<\/strong> above the map. A pop-up window will appear as shown below.<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607814-135-b34a49b7.png\" \/><\/p>\n<p>If needed, separate information text can be filled out about the task in the <strong>Description<\/strong> box. However, it is not mandatory.<\/p>\n<p>By choosing the option <strong>Whole company<\/strong> from the dropdown list, it is another way to possibly find a person, if they cannot be found under the default option <strong>Own office<\/strong>. Both of these lists, will only show employees that have been certified by in4mo.<\/p>\n<p>To assign a person to the task, the name of the person needs to be selected first under the <strong>Employees<\/strong> list and after that, <strong>the arrow in the middle that points to the right<\/strong>, needs to be clicked, so that the name moves under the <strong>Assignees<\/strong> list.<\/p>\n<p>When a task has been assigned to a responsible person the status for the task(s) switches to status <img loading=\"lazy\" decoding=\"async\" class=\"\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607814-136-c2ad6779.png\" width=\"25\" height=\"28\" \/>.<\/p>\n<p>If possible, a scheduled start and end time is good to set as well, after a responsible person has been assigned to the task(s). However, the scheduled time can be updated later from both the web portal and the mobile application.<\/p>\n<p>When a scheduled start and end time are set along with a responsible person, the status for the task(s) will switch to <img loading=\"lazy\" decoding=\"async\" class=\"\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607815-137-96d755b2.png\" width=\"31\" height=\"29\" \/>.<\/p>\n<h3>Multiple Task Assignment<\/h3>\n<p><strong><u><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607815-138-27c353e7.png\" \/><br \/>\n<\/u><br \/>\n<\/strong>Multiple tasks can also be assigned to responsible person(s) at the same time and\/or set a scheduled start- and end date for all the tasks at once.<\/p>\n<p>By clicking the <strong>Assign members<\/strong> under the task list to the left, after own company has been assigned to the tasks, a pop-up window will appear showing all the tasks assigned to own company.<\/p>\n<p>Descriptions can be typed as well as scheduled start and end times, can be set and\/or modified for each task separately. To choose or edit assignees, click <strong>Edit<\/strong><br \/>\nnext to <strong>Assignees<\/strong>.<\/p>\n<p><strong><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607816-139-f5e0be43.png\" \/><\/strong><\/p>\n<p>In the next pop-up window that opens, the person(s) needs to be selected from the <strong>Employees<\/strong> list to the left, to which the task(s) should be assigned to. To the right, the available task(s) in the case are shown, for which the person(s) can be assigned for. When the selection(s) has been made, the next step is to click <strong>Save<\/strong> to confirm the settings.<\/p>\n<p>To remove a person from a task, the <strong>x<\/strong> icon needs to be clicked next to the person\u2019s name, which will then remove the person from the <strong>Assignees<\/strong> list. Another way is also to untick specific tasks that have been selected before for the person.<\/p>\n<p><strong>NOTE! If a person has not been certified by in4mo, then it is not possible to select a task for this specific person. In this case the system informs it with a <img loading=\"lazy\" decoding=\"async\" class=\"\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607816-140-cc891dc2.png\" width=\"18\" height=\"18\" \/>when you have the mouse over a selection box for a task.<\/strong><\/p>\n<p>By clicking the start or the end dates fields, a scheduled start and end time can be set or modified for each task separately. By default, when clicking on the <strong>Start date<\/strong> field and a date from the calendar that opens is chosen, the system will automatically fill out the <strong>End date<\/strong> field to be the same date, so this is good to keep in mind that if needed, it needs to be edited separately. When modifying the dates that have already been set after saving, the system asks (which is optional to fill in), what is the reason for the changing of dates.<\/p>\n<h2>Adding Budget to Task(s)<\/h2>\n<p>This next part explains how to add budget(s) to task(s) in cases. If iCC (in4mo Cost Calculation) is activated in the portal, there are separate instructions available for that, which can be read more about here and here.<\/p>\n<p>Generally, all tasks (except inspection, first aid and project management tasks) require a budget to be accepted by the insurance company, before the actual reporting can be started from the mobile application. This applies if the insurance company has not set the budgets to be<br \/>\npre-approved for tasks.<\/p>\n<p>The company that has been assigned for the task is also responsible for adding the budget, meaning budgets can only be added to own tasks. Budget(s) can be added only when the task(s) is\/are in status <img loading=\"lazy\" decoding=\"async\" class=\"\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607816-141-140c1262.png\" width=\"29\" height=\"27\" \/>.<\/p>\n<p><strong>To add the budget (there are two options to choose from):<\/strong><\/p>\n<ul>\n<li>By going to <strong>Task information<\/strong> in a task and clicking the <strong>Add budget for task(s)<\/strong>.<\/li>\n<\/ul>\n<p><strong>OR<\/strong><\/p>\n<ul>\n<li>By clicking the <strong>Budget <\/strong>sub header of the case and clicking the <strong>Add budget for task(s)<\/strong>.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607817-142-7692081d.png\" \/><\/p>\n<p>In the pop-up window that opens, a short description for the budget, the total amount <strong>excluding material and VAT<\/strong> and a budget calculation file from your PC, needs to be added so that it is possible to proceed. <strong>NOTE! Without a budget calculation file, a budget cannot be sent for approval.<\/strong><\/p>\n<p>The task(s) that are related to the budget need to be selected. A comment can also be added for the budgets if desired, but it is not mandatory.<\/p>\n<p>When all the information has been filled out, the next step is to click <strong>Send for approval<\/strong>. The task(s) which a budget has been sent in for approval, switches to status <img loading=\"lazy\" decoding=\"async\" class=\"\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607817-143-bc47abaf.png\" width=\"29\" height=\"27\" \/>.<\/p>\n<h2>Updating Budgets<\/h2>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607818-144-90008fac.png\" \/><\/p>\n<p>If the budget needs to be modified, it can be done by first clicking on the <strong>Budget<\/strong> tab on the sub headers, and then <strong>Edit<\/strong> on the right of the task under the <strong>Log<\/strong><br \/>\ncolumn.<\/p>\n<p><strong>NOTE! A budget and the calculation file can only be modified when the budget is either rejected or approved.<\/strong><\/p>\n<p>When a budget is approved, the status of the task switches to status <img loading=\"lazy\" decoding=\"async\" class=\"\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607818-145-fc3dfbcf.png\" width=\"22\" height=\"22\" \/> and the WI (Work Item) description field turns to <span style=\"color: #99cc00;\">green<\/span> from <span style=\"color: #ffb132;\">yellow<\/span>.<\/p>\n<p><strong>When the status of the task is B++ the reporting from the mobile application can start, depending of course if the compensation decision is positive for the case. <\/strong><\/p>\n<p>When a budget is rejected, the status of the task switches back to status <strong>2<\/strong>. The description field is then <span style=\"color: #ff0000;\">red<\/span>. The information can then be modified by clicking <strong>Edit<\/strong>.<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607818-146-160307bb.png\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607819-147-a50d6653.png\" \/>When a budget is updated in an ongoing task (the task is in status <strong>3<\/strong>), the status of the task switches to <img loading=\"lazy\" decoding=\"async\" class=\"\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607819-148-46c2d14f.png\" width=\"27\" height=\"27\" \/> . This means that the work can continue, but only the original budget is approved, until the insurance company approves the updated budget. If the insurance company rejects the updated budget, task will switch back to status <strong>3<\/strong> and the work can still be continued normally.<\/p>\n<p><strong>NOTE! A task cannot be marked as completed in the mobile application until the budget is approved and the status is back in 3.<\/strong><\/p>\n<p>The budget can still be modified when the task has reached status <strong>4<\/strong> or <strong>A<\/strong> as <strong>completed\/approved<\/strong>, but instead of the budget being modified \u2013 a new budget will appear for the task instead and the old budget will still be visible, but with a <strong>white description field<\/strong>.<\/p>\n<h2>Starting and Managing the Reconstruction Project<\/h2>\n<p><strong>The project management task will switch to status 3 when the reporting from the damage site in the repair project starts (two options):<\/strong><\/p>\n<ul>\n<li><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607820-149-ef1cafab.png\" \/>By the project manager when (s)he reports the first item in the project management task on the mobile application e.g. a picture is taken.<\/li>\n<\/ul>\n<p><strong>OR<\/strong><\/p>\n<ul>\n<li>When the assigned person for the first repair task starts the reporting by taking the first picture.<\/li>\n<\/ul>\n<p>When the project management task is available in the mobile app, it is possible to report from the damage site if needed. The reported items will be synchronized and visible in the <strong>Multimedia<\/strong> tab of the task in the web portal, as in any other task.<\/p>\n<p>If the task information for the project manager task needs to be modified, it can be done by clicking on <strong>Edit<\/strong> in the <strong>Task information<\/strong><br \/>\ntab of the task.<\/p>\n<p><strong>NOTE!<\/strong> <strong>The start time of the project manager task is automatically the time when the task was assigned to the partner office.<\/strong><\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607821-150-0bec9354.png\" \/><\/p>\n<h2>Approving and Completing Task(s)<\/h2>\n<p>By clicking the sub header <strong>Project plan<\/strong>, all the tasks can be seen in the case including details about the assigned person(s), as well as the scheduled start- and end times. Report items can be viewed via the <strong>Multimedia<\/strong><br \/>\nlink next to the <strong>End time<\/strong> column.<\/p>\n<p>Here it is possible to follow up, that all steps are completed for the task(s) and that the work on the damage site is proceeding.<\/p>\n<p><strong><br \/>\n<img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607822-151-cbcc4788.png\" \/><br \/>\n<\/strong><\/p>\n<p>If information, like the reported item(s) is needed to be viewed of a specific task, it can be done by clicking the <strong>Multimedia<\/strong> link.<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607822-152-57dd1d23.png\" \/><\/p>\n<p>When the assigned person(s) of their assigned task, has marked their task as completed (the status is in status <strong>4<\/strong>), each task is to be either approved or rejected by the project manager.<\/p>\n<p><strong><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607823-153-9f524b73.png\" \/><br \/>\n<\/strong><\/p>\n<p>When all the repair tasks in the project are marked as approved and are in status <strong>green A<\/strong>, the project manager\u2019s task status switches automatically to<strong> 4<\/strong>. The <strong>Approve<\/strong> button appears in the <strong>Task information <\/strong>tab when the task is in status <strong>4<\/strong>. The <strong>Reject<\/strong> button appears when the task is in status <strong>4<\/strong>, so if it is considered that the task has not been completed, then the <strong>Reject <\/strong>button can be clicked, which will then switch the task\u2019s status back to status <strong>3<\/strong>.<\/p>\n<p><strong>Once the repair tasks have been approved, the project manager can: <\/strong><\/p>\n<ul>\n<li>Create and assign more tasks to complete the reconstruction project<\/li>\n<\/ul>\n<p><strong>OR <\/strong><\/p>\n<ul>\n<li>Mark the project management task as completed. When marking the project management task as approved, the status for the task switches to status<strong> A<\/strong>, like in the other repair tasks.<\/li>\n<\/ul>\n<p>If more tasks need to be added, then it can be done by clicking the <strong>Add\/remove case tasks<\/strong><br \/>\nbutton. Otherwise, the project is now completed.<\/p>\n<p><strong><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607824-154-6991ddb0.png\" \/>NOTE! Project manager needs to check the task(s) and do the final approval for them, so the task(s) switch their status to <img loading=\"lazy\" decoding=\"async\" class=\"\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607825-155-3fc82fef.png\" width=\"25\" height=\"25\" \/>. <\/strong><\/p>\n<p><strong>In some insurance companies, it is required that all the task(s) need to be either in status A or C, so that the case handler can later close the case.<\/strong><\/p>\n<h2>Adding and Sending Invoice for Approval<\/h2>\n<p>To add invoice to task(s), it can be done by clicking from the sub headers the<br \/>\n<strong>Invoice <\/strong>tab and then, by clicking the <strong>Add invoice<\/strong> to the right.<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607825-156-ec2d52f8.png\" \/><\/p>\n<p>In the pop-up window that opens, information about the invoice can be filled out. There are a few mandatory fields such as <strong>Amount<\/strong>, <strong>Invoice number<\/strong> and who the invoice is <strong>from<\/strong> that need to be specified. Also <strong>adding an invoice file<\/strong> is mandatory. Other fields are optional to fill in. When all the information has been filled out, then by clicking the <strong>Add<\/strong> button, the invoice will be added to the case.<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607826-157-eb01bfef.png\" \/><\/p>\n<p>Only those members of the company who have the right to see the budget can add\/see\/modify invoices for the company offices. The <strong>Can see budget<\/strong> needs to be activated for those members, who need to add\/see\/modify budgets and invoices for cases. This setting can be found on the page <strong>Company admin &gt; Members<\/strong>.<\/p>\n<p>All invoices will be saved both under the <strong>Invoice<\/strong> tab in the sub header menu and in the <strong>Documents library<\/strong>. An invoice icon <img decoding=\"async\" src=\"\/wp-content\/uploads\/sites\/2\/4-in4mo-project-manager-rel-14-1762510607826-158-da911390.png\" \/> will also be visible on the case list for the case.<\/p>\n<p>All invoices will be sent for approval to the case handler, who can either accept or reject the invoice. Once the invoice is approved, it can still be rejected afterwards. The same goes for invoices that have been rejected, they can still be approved afterwards.<\/p>\n<p>Insurance company users can also attach invoices on behalf of the company.<\/p>\n<p><strong>NOTE: You are able to see only invoices for the tasks your company has been assigned in a case. <\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>These instructions will explain the basic steps and actions the project manager have to know to get all the benefits of in4mo.<\/p>\n","protected":false},"featured_media":0,"parent":0,"template":"","class_list":["post-7568","resources","type-resources","status-publish","hentry","type-building-claims","type-contractor","type-project-manager","type-roles"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project Manager - In4mo Support<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project Manager - In4mo Support\" \/>\n<meta property=\"og:description\" content=\"These instructions will explain the basic steps and actions the project manager have to know to get all the benefits of in4mo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"In4mo Support\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-31T12:43:54+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/resources\\\/project-manager-user-guide\\\/\",\"url\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/resources\\\/project-manager-user-guide\\\/\",\"name\":\"Project Manager - In4mo Support\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/#website\"},\"datePublished\":\"2022-09-02T06:00:31+00:00\",\"dateModified\":\"2026-07-31T12:43:54+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/resources\\\/project-manager-user-guide\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.in4mo.com\\\/support\\\/resources\\\/project-manager-user-guide\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/resources\\\/project-manager-user-guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Resources\",\"item\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/resources\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Project Manager\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/#website\",\"url\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/\",\"name\":\"In4mo Support\",\"description\":\"Insurance and Construction Software\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.in4mo.com\\\/support\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project Manager - In4mo Support","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/","og_locale":"en_US","og_type":"article","og_title":"Project Manager - In4mo Support","og_description":"These instructions will explain the basic steps and actions the project manager have to know to get all the benefits of in4mo.","og_url":"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/","og_site_name":"In4mo Support","article_modified_time":"2026-07-31T12:43:54+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/","url":"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/","name":"Project Manager - In4mo Support","isPartOf":{"@id":"https:\/\/www.in4mo.com\/support\/#website"},"datePublished":"2022-09-02T06:00:31+00:00","dateModified":"2026-07-31T12:43:54+00:00","breadcrumb":{"@id":"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.in4mo.com\/support\/resources\/project-manager-user-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.in4mo.com\/support\/"},{"@type":"ListItem","position":2,"name":"Resources","item":"https:\/\/www.in4mo.com\/support\/resources\/"},{"@type":"ListItem","position":3,"name":"Project Manager"}]},{"@type":"WebSite","@id":"https:\/\/www.in4mo.com\/support\/#website","url":"https:\/\/www.in4mo.com\/support\/","name":"In4mo Support","description":"Insurance and Construction Software","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.in4mo.com\/support\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.in4mo.com\/support\/wp-json\/wp\/v2\/resources\/7568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.in4mo.com\/support\/wp-json\/wp\/v2\/resources"}],"about":[{"href":"https:\/\/www.in4mo.com\/support\/wp-json\/wp\/v2\/types\/resources"}],"version-history":[{"count":0,"href":"https:\/\/www.in4mo.com\/support\/wp-json\/wp\/v2\/resources\/7568\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.in4mo.com\/support\/wp-json\/wp\/v2\/media?parent=7568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}